CSV vs. CSA: What the FDA’s Shift to Computer Software Assurance Changes for Your Next Validation
Where the FDA’s computer software assurance guidance stands in 2026, how it differs from traditional computer system validation and what it changes for MES and automation projects.
Quick answer
CSV proves software works mainly through scripted tests and documentation for every function. CSA, the FDA’s risk-based approach, scales effort to process risk: more rigor, such as scripted testing, where a failure could foreseeably compromise device safety, and lighter unscripted testing elsewhere. FDA finalized the guidance in 2025 and updated it in February 2026.
Key takeaways
- The FDA’s CSA guidance was issued September 24, 2025 and updated February 3, 2026 to align with the Quality Management System Regulation (QMSR).
- CSA scales assurance to process risk. Functions whose failure could foreseeably compromise device safety warrant more rigor, such as scripted or hybrid testing.
- Unscripted testing (scenario, error-guessing and exploratory) is an accepted assurance activity for functions that are not high process risk.
- The FDA recommends records drawn from system logs and audit trails rather than screenshots and paper.
Validation teams in regulated plants often face challenges with documentation. A software update that takes a single afternoon to configure can take weeks to document. Computer software assurance (CSA) is the FDA’s answer to that imbalance. It keeps the goal the same, confidence that software does what it is supposed to do, and changes the required effort.
This guide covers the current guidance, how CSA compares with traditional computer system validation (CSV) and what it changes when you validate MES, SCADA or other plant-floor software.
What is the current status of the FDA’s CSA guidance?
The FDA’s Center for Devices and Radiological Health (CDRH) and Center for Biologics Evaluation and Research (CBER) issued a draft in September 2022, finalized it on September 24, 2025 and issued an updated version on February 3, 2026. The current document is titled Computer Software Assurance for Production and Quality Management System Software.
The February 2026 update aligns the guidance with the Quality Management System Regulation, which took effect February 2, 2026 and incorporates ISO 13485:2016 into 21 CFR Part 820 by reference. The guidance now points to ISO 13485 Subclauses 4.1.6, 7.5.6 and 7.6 for software validation. It also replaces Section 6 of the FDA’s 2002 General Principles of Software Validation, the section that covered production and quality system software.
Like other FDA guidance, it contains nonbinding recommendations. It describes how the FDA expects manufacturers to think about assurance.
What is computer software assurance?
CSA is a risk-based approach for establishing and maintaining confidence that software used in production or the quality management system is fit for its intended use. The guidance organizes the work into a framework:
- Identify the intended use. Decide whether each software feature, function or operation is used directly as part of production or the quality management system, or supports it.
- Determine the risk-based approach. Assess whether a failure would pose a high process risk.
- Determine the assurance activities. Choose testing and other activities that match the risk.
- Establish the appropriate record. Capture enough objective evidence to show the function was assessed and performs as intended.
The guidance also covers software changes and electronic records considerations under 21 CFR Part 11.
What is the difference between CSV and CSA?
CSV and CSA share the same objective. The difference is where effort goes and what counts as evidence.
| Traditional CSV | CSA | |
|---|---|---|
| Starting point | Validate the system as a whole | Assess each feature, function or operation by intended use |
| Effort allocation | Often uniform across functions | Scaled to process risk: high or not high |
| Testing | Mostly scripted test protocols | More rigor, such as scripted or hybrid testing, for high process risk; unscripted methods for the rest |
| Supplier work | Often re-tested by the manufacturer | Vendor assessments and supplier testing can count toward assurance |
| Evidence | Paper protocols and screenshots | Digital records such as system logs and audit trails preferred |
| What the record proves | Proof that every step was documented | Proof the function performs as intended for its risk |
How does CSA determine what is high risk?
The guidance organizes process risk into two categories. A software feature, function or operation is high process risk when its failure to perform as intended may result in a quality problem that foreseeably compromises safety. Everything else is treated as not high process risk, even when a manufacturer grades it as medium or low internally.
Functions the guidance generally treats as high process risk include those that maintain process parameters, such as temperature, pressure or humidity, that are essential to device safety, and those that measure, inspect or determine the acceptability of product. Functions that collect and record data for monitoring and review are typical examples of lower process risk.

What testing methods does CSA accept?
- Scripted testing
- Test cases with recorded steps, expected results and evidence. It can be limited or robust. For high process risk, the guidance suggests scripted testing or a hybrid with unscripted methods.
- Scenario testing
- Also called ad-hoc testing. The tester works through realistic use scenarios without a step-by-step script.
- Error-guessing
- The tester uses experience to target likely failure points, such as boundary values and unusual inputs.
- Exploratory testing
- Experience-based testing where the tester learns the system while testing it and adapts as they go.
Manufacturers can combine methods, for example a hybrid of limited scripted testing and exploratory testing, and scale them to the risk.
Planning a validated system upgrade?
Flexware Innovation’s Life Sciences team builds MES and automation systems with the validation approach planned from the first requirement.
What does CSA change on an MES or automation project?
On a plant-floor project, CSA shifts validation planning from the system level to the function level. A manufacturing execution system or SCADA platform contains functions with very different risk, and each can carry its own assurance plan. The table below is an illustration, not a determination for any specific system. Each manufacturer makes its own risk assessment.

| Example function | Likely process risk | Possible assurance approach |
|---|---|---|
| Recipe download of safety-essential setpoints to equipment | High | Robust scripted testing with recorded evidence |
| Electronic batch record step that determines product acceptability | High | Scripted testing, including boundary and failure cases |
| Equipment status dashboard used for monitoring | Not high | Exploratory or scenario testing, captured in system logs |
| Shift production report for management review | Not high | Vendor assessment plus unscripted testing |
Three practical changes follow from this approach:
- Risk assessment moves earlier. Classifying functions during the requirements and design phase lets the team plan testing effort before development, so validation is not the last task holding up go-live.
- Supplier evidence becomes part of the plan. Vendor assessments, platform testing and installation records can support assurance when the manufacturer has evaluated them.
- The system becomes part of the record. Audit trails, change logs and automated test results can serve as objective evidence. That makes how you configure logging and industrial data management part of the validation design.
What should a CSA record include?
The guidance recommends that the record capture the intended use of the function, the result of the risk-based analysis and documentation of the assurance activities. That documentation includes a description of the testing, any issues found, a conclusion on whether the software is acceptable for its intended use, who performed the work and when, and review and approval where appropriate. The FDA notes the record does not need more evidence than necessary to show the function performs as intended for the risk identified.
“With Flexware’s design and development experience, our company’s manufacturing operations will benefit greatly through improved product quality, risk avoidance, and through the use of true metrics and reporting.”
Manufacturing Manager, Life Science Manufacturer, Flexware Innovation client
Does CSA apply to pharmaceutical manufacturing?
Formally, the guidance covers software used in medical device production and quality management systems, including devices regulated by CBER. Drug manufacturers are outside its direct scope. Many pharmaceutical and biotech companies apply the same risk-based thinking through GAMP 5 Second Edition, published by ISPE in July 2022, which emphasizes critical thinking and scaling effort to risk. ISPE has stated that the objectives of the CSA guidance can be achieved by applying GAMP 5 Second Edition. Part 11 requirements for electronic records and signatures still apply across both.
How do you move from CSV to CSA?
- Update the validation procedure. Add function-level intended use and process risk assessment to your SOPs.
- Define your assurance menu. Document which scripted and unscripted methods you accept for each risk level.
- Qualify your suppliers. Set criteria for when vendor documentation and testing can be relied on.
- Design records into the system. Confirm audit trails, logs and automated test outputs meet your record requirements.
- Pilot on one system. Apply CSA to a single upgrade or change, review the result with quality and refine before scaling.
For teams deciding which layer of the plant to modernize first, our guides to MES vs. SCADA and choosing a systems integrator cover the next decisions. Flexware Innovation’s Life Sciences and consulting teams work on these programs.
Frequently asked questions
Is the FDA’s CSA guidance final?
Yes. The FDA finalized the guidance on September 24, 2025 and issued an updated version on February 3, 2026 to align with the Quality Management System Regulation. The draft was issued in September 2022.
Does CSA replace computer system validation?
CSA is a risk-based way to meet software validation expectations for production and quality management system software. It replaces Section 6 of the FDA’s 2002 General Principles of Software Validation guidance. The requirement to validate software for its intended use remains.
What is unscripted testing?
Unscripted testing is dynamic testing where the tester’s actions are not prescribed step by step. The FDA’s guidance names scenario (ad-hoc) testing, error-guessing and exploratory testing as examples.
Does CSA change 21 CFR Part 11 requirements?
No. Part 11 requirements for electronic records and signatures still apply. The guidance includes considerations for electronic records alongside the assurance framework. Our guide to 21 CFR Part 11 and your MES covers those controls.
Does CSA apply to cloud and SaaS software?
Yes, when the cloud service is used as part of production or the quality management system. The guidance addresses SaaS, PaaS and IaaS models and how intended use determines what needs assurance.